Taking Something Down in Ottawa? Start With the Permit and the Gas

Get matched with local demolition contractors. See what the City asks for before a demolition, which utilities sign off first, and what published guides say it costs.

Free matching. No phone number needed; contractors reply by email. We do not license or screen the contractors we forward requests to.

This site: everything above the ground line. Foundations, digging and backfill are excavation work.

Start with what you are taking down:

What are you taking down?

Pick the job. You get the City's permit wording, the utilities involved, what to test for first, and the other rules that can apply, then one button that sends it to local demolition contractors.

Pick the job

Interior strip-out

Permit
The City says the demolition of non-load-bearing interior partitions does not require a demolition permit. It says nothing either way about stripping finishes, so ask Building Code Services; the renovation after may need a building permit. A load-bearing wall is structural work for a carpenter.
Utilities
Before anything is removed, ask who isolates the plumbing and wiring in the work area, and get the answer in writing.
Test first
Health Canada: asbestos was mainly used in homes before 1990, and a home built before 1960 probably has lead-based paint. Test before anything is torn out; removal of asbestos is a job for an abatement contractor.
Also
The City's site-fence rule has an exemption when all the demolition is inside an existing structure and entry to it is limited.
Prices
Kitchen strip-out about $1,500 to $5,000; bathroom about $1,000 to $4,000; full gut to the studs about $12 to $25 per square foot. Published prices seen October 2026 (Ontario, GTA and Canada; we found no Ottawa-specific published price).

Shed, garage or deck

Permit
The City requires a permit to demolish a building or structure, and its demolition page gives no size below which a shed is exempt. Confirm with Building Code Services before taking it down.
Utilities
If power or a gas line runs to it, ask who arranges the disconnection. The City's clearances form says Enbridge needs 44 days from payment to disconnect natural gas service.
Test first
Older outbuildings can hold asbestos or lead paint too. Health Canada advises a professional test before renovating or demolishing.
Also
Garages and sheds are outside the Demolition Control By-law, which excludes "a subordinate or accessory building". Slab removal is priced as an extra, and anything below grade is excavation work.
Prices
Wood-frame detached garage about $3,000 to $8,000; masonry costs more. No shed or deck range: we did not find two independent published prices. Published prices seen October 2026 (Ontario, GTA and Canada; we found no Ottawa-specific published price).

A whole house

Permit
"You need to obtain a building permit to relocate or demolish an existing building or structure." First review: about 10 business days. An inspection is booked 48 hours ahead when demolition starts.
Utilities
Every service is cut off and capped first, with sign-offs on the City's clearances form. Gas is the long one: 44 days from payment.
Test first
The City's demolition page says a project owner must identify designated substances such as asbestos and lead and give the list to contractors before contracting (Occupational Health and Safety Act, section 30).
Also
Inside the Area of Demolition Control a demolition control permit may be needed, and a designated heritage property needs council consent. Basement walls, footings and backfill are excavation work.
Prices
Typical house about $15,000 to $40,000, or about $5 to $10 per square foot. Below-grade removal and backfill are extra. Published prices seen October 2026 (Ontario, GTA and Canada; we found no Ottawa-specific published price).

City permit fee for your floor area

2026 fee schedule: $117 for the first 5,000 square feet of gross floor area, plus $12.75 for each additional 1,000 square feet or part of it. A sewer disconnection fee may apply.

This tool repeats City and Health Canada wording. It is not a ruling on your property: Building Code Services decides what your job needs.

Get quotes for this

Gas first: the utility sign-offs

Before a demolition permit is issued, the City's Demolition Permit Clearances Form is signed by each utility connected to the property. The owner arranges each one, and fees may be levied by each utility.

Demolition Permit Clearances Form: one box per utility

Enbridge Gas start first

"Enbridge Gas Distribution requires 44 days from time-of-payment to disconnect natural gas service." Start this first.

Enbridge Gas: 44 days from payment to disconnection, drawn on a day scale Day 44: gas off Pay Day 14 Day 28
Enbridge Gas Distribution requires 44 days from time-of-payment to disconnect natural gas service (City of Ottawa clearances form).
  • Hydro Ottawa or Hydro One Electrical service removed. Hydro Ottawa removes a 200 A or smaller service on a single-family or duplex home free of charge at the homeowner's request.
  • City water Disconnect water utility.
  • City sewer Disconnect sewer utility. A sewer disconnection fee may apply.
  • Bell and Rogers Each signs off where it is connected to the property.
  • Septic (rural lots) Tank pumped, filled with sand and capped; RVCA wants its form at least 5 days before work.
  • Heating oil The owner confirms the oil tank has been emptied, if there is one.

The owner also certifies the premises are free of rodents. The scale bar shows Enbridge's 44 days only; the other sign-offs have no published lead time.

Demolition stops at grade

Everything above the ground line is demolition, and this site covers it. Below the line, removing foundations, footings and slabs, then backfilling and grading, is excavation work, quoted separately.

A house in section with the ground line drawn across it Above the ground line: roof, walls, floors, interior finishes, a porch and a garage, labelled demolition. Below it: basement walls, footings and the floor slab, labelled excavation. GROUND LINE ABOVE: demolition BELOW: excavation

Above grade: demolition

  • Roof and attic
  • Walls and floors
  • Interior finishes to the studs
  • Porch, deck, garage, shed
  • Debris hauled away

Below grade: excavation

  • Basement walls and footings
  • Floor slab
  • Backfill and compaction
  • Grading and sod

Below-grade work: see excavateottawa.ca, a separate site in the same network.

On site: fence and working hours

Site fence (Building By-law)

  • 1.8 mfence if the building is 3.0 m or less from a public way
  • 1.2 mfor a residential building of up to three storeys set farther back
  • Exemptwhen all the demolition is inside an existing structure and entry is limited

Working hours

Hours when construction equipment may run. The City's 3-1-1 page groups demolition, construction and infill projects under the stricter hours.

Construction, Mon to Sat

7 am to 10 pm

Construction, Sun and holidays

9 am to 10 pm

Demolition and infill, Mon to Fri

7 am to 8 pm

Demolition and infill, Sat, Sun and holidays

9 am to 7 pm

Equipment may run No equipment

Construction equipment hours, City of Ottawa Noise By-law 2017-255 and the City's 3-1-1 page
Work and daysEquipment may run fromUntil
Construction, Mon to Sat7 am10 pm
Construction, Sun and holidays9 am10 pm
Demolition and infill, Mon to Fri7 am8 pm
Demolition and infill, Sat, Sun and holidays9 am7 pm

We found no City rule requiring a neighbour notice before a house demolition.

Get Matched Free

Tell us what you are taking down and we send it to local Ottawa demolition contractors

Before 1990 or not sure: plan an asbestos test first (Health Canada). Gas: Enbridge needs 44 days from payment to disconnect.

Fields marked are required. No phone number needed — your matches reply by email.

Frequently Asked Questions

Do I need a permit to demolish a house or garage in Ottawa?

Yes for a house. The City of Ottawa says "You need to obtain a building permit to relocate or demolish an existing building or structure." Its demolition page names two exemptions: "certain building types (silos, and barns)" and non-load-bearing interior partitions. A detached garage is a building, so plan on a permit; for a small shed the page gives no size threshold, so ask the City's Building Code Services before taking it down.

What is the City's fee for a demolition permit in 2026?

The 2026 fee schedule lists a Permit to Demolish at $117 for the first 5,000 square feet of gross floor area, plus $12.75 for each additional 1,000 square feet, and notes that a sewer disconnection fee may apply. The $1,170 and $3,510 figures on the same schedule are surcharges for starting a demolition before the permit is issued on a demolition-control or designated heritage property, not the permit fee.

Do I need an asbestos test before demolition?

Health Canada advises hiring a professional to test for asbestos before renovating or demolishing, and says asbestos was mainly used in buildings and homes before 1990. The City's demolition page says a project owner must identify designated substances and give the list to prospective contractors before contracting, under section 30 of the Occupational Health and Safety Act. If asbestos is found, its removal is a job for an asbestos abatement contractor.

Do demolition contractors need a licence in Ontario?

We found no demolition-contractor licence in Ontario's trade rules or the City's business licence list. Ask for a WSIB clearance certificate and proof of liability insurance, and check them yourself. This site does not license, screen or verify contractors.

Find a Demolition Contractor