Demolition Costs in Ottawa: Permit, Teardown, Haul-Away
A demolition brings three different bills: the City's permit, the contractor's price to take the structure down to grade, and the cost of getting rid of the debris. Every cost page keeps them in three lanes of one job sheet, in their own units, and never adds them together.
Published prices seen October 2026 (Ontario, GTA and Canadian sources; we found no Ottawa-specific published price). Not quotes. Reviewed October 2, 2026. How we set these ranges
Cost pages
- Whole houseAbout $5 to $10 per square footWhole house: about $15,000 to $40,000
- Detached garageAbout $3,000 to $8,000
- Kitchen strip-outAbout $1,500 to $5,000
- Bathroom strip-outAbout $1,000 to $4,000
- Basement strip-outAbout $4,000 to $11,000
- Interior gut and single roomsSelective: about $4 to $15 per sq ftFull gut to the studs: about $12 to $25 per sq ftSingle room: about $1,500 to $4,500
- Deck, porch and shedNo published range
- Rural and farm buildingsNo published range
The City's demolition permit fee
The City of Ottawa's fee schedule for January 1, 2026 sets the Permit to Demolish at $117 for the first 5,000 square feet (464.5 square metres) of gross floor area or portion thereof, plus $12.75 for each additional 1,000 square feet (92.9 square metres) or part thereof. The same line notes that a sewer disconnection fee may apply; we found no published amount for it.
Worked out on that formula: a 2,200 square foot house is $117, and a 6,000 square foot building is $117 plus $12.75, or $129.75.
Two larger figures on the same schedule are not permit fees. They are administrative surcharges for starting before the permit is issued: $1,170 where the building was on property subject to the Demolition Control By-law, and $3,510 on designated property under the Ontario Heritage Act. For all other cases the surcharge is 50 per cent of the permit fees, up to $10,000.
Utilities are separate again: the City's clearances form says fees may be levied by each utility for disconnecting or blanking its service, and that Enbridge Gas Distribution requires 44 days from time of payment to disconnect natural gas service.
Trail Road Landfill rates, 2026
The City says plaster, wood (including pressure-treated lumber), drywall, concrete, asphalt and other waste from construction, renovation or demolition is not collected with regular garbage: it goes to the Trail Road Landfill Site or another landfill. The City's 2026 rates at Trail Road:
- Construction material from the home owner (counted with residential garbage): $172.70 per tonne above 250 kg, minimum $43.20.
- Fill (asphalt, masonry, concrete without rebar): $144 per tonne, minimum $36.
- Soil: $81.90 per tonne (over 5 tonnes needs pre-approval).
- Not accepted: asbestos, and commercial garbage.
These are the City's rates at its own landfill and give context only; they are not the price of hauling your job. Ask where your contractor takes the debris and whether disposal is in the price.
Services
- Whole House Demolition
- Garage & Shed Demolition
- Interior Strip-Out
- Deck, Porch & Above-Ground Pool Removal
- Rural Building & Outbuilding Removal
Below grade (foundations, digging, backfill): excavateottawa.ca. Asbestos testing and removal: ottawaabatement.com. Bins: ottawaconstructionbins.ca. We are a matching service, not a demolition contractor, and we do not screen or verify contractors.