Free Demolition Contractor Matching Permits, Utilities & Published Prices Demolition Across Ottawa
Find a Demolition Contractor

House Demolition Cost in Ottawa: Permit, Teardown, Haul-Away

  • About $5 to $10 per square foot
  • Whole house: about $15,000 to $40,000

A house teardown brings three different bills: the City's permit, the contractor's price to take the house down to grade, and what it costs to get rid of the debris. They come in different units and from different places, so the sheet below keeps them in their own lanes. Enter your floor area to see the permit fee and the published per-square-foot range worked out for your house.

Service: Whole House Demolition Reviewed October 2, 2026. How we set these ranges

Job sheet

Whole house

Three bills in three units. They are never added together.

City permitper application

$117 for the first 5,000 sq ft

Permit to Demolish, 2026: $117 for the first 5,000 square feet of gross floor area, plus $12.75 for each additional 1,000 square feet or part of it. How the fee works

  • The fee schedule notes that a sewer disconnection fee may apply. We found no published amount, so none is shown.
  • Every utility connected to the house signs the City's clearances form first, and each may charge its own fee. Enbridge Gas needs 44 days from payment to disconnect gas.
  • Inside the Area of Demolition Control, a demolition control permit is a separate step from the demolition permit.

Teardownper sq ft · per job

Per square foot

About $5 to $10

For your floor area (our arithmetic on the published range): $5 to $10 times your floor area

  • A national home-services price guide, updated August 2026: $5 to $10 per square foot (Ontario)
  • An Ontario contractor-quote site, 2026: $5 to $10 per square foot (Ontario)

Whole job

About $15,000 to $40,000

  • An Ontario cost guide, last reviewed June 2026: $15,000 to $40,000, full house
  • A Toronto demolition company, February 2025: $15,000 to $50,000 and up, full house
  • A Canadian renovation-quote site, updated March 2026: $10,000 to $50,000 for a house (Canada)

Two separate published figures: neither is worked out from the other. Removing the basement walls and floor slab, and backfilling the hole, is below grade: that is excavation, excavateottawa.ca.

Published prices seen October 2026 (Ontario, GTA and Canadian sources; we found no Ottawa-specific published price). Not quotes.

Haul-awayper tonne

The City's rates at its own landfill: context, not a price for your job.

  • Fill (asphalt, masonry, concrete without rebar) is $144 per tonne (minimum $36).
  • Trail Road Landfill, 2026: construction material from the home owner is $172.70 per tonne above 250 kg (minimum $43.20).
  • The landfill does not accept asbestos or commercial garbage.

Ask where your contractor takes the debris and whether disposal is in the price. All 2026 Trail Road rates

Not on this sheet

  • Basement walls, foundation, backfill (below grade)excavateottawa.ca
  • Asbestos testing and removalottawaabatement.com
  • Bin rentalottawaconstructionbins.ca
Get quotes for this
Whole house: the three lanes of the job sheet. The lanes are never added together.
LaneItemFigure or rule
City permitPermit to Demolish, 2026Permit to Demolish, 2026: $117 for the first 5,000 square feet of gross floor area, plus $12.75 for each additional 1,000 square feet or part of it.
TeardownPer square foot (A national home-services price guide, updated August 2026)$5 to $10 per square foot (Ontario)
TeardownPer square foot (An Ontario contractor-quote site, 2026)$5 to $10 per square foot (Ontario)
TeardownWhole job (An Ontario cost guide, last reviewed June 2026)$15,000 to $40,000, full house
TeardownWhole job (A Toronto demolition company, February 2025)$15,000 to $50,000 and up, full house
TeardownWhole job (A Canadian renovation-quote site, updated March 2026)$10,000 to $50,000 for a house (Canada)
Haul-awayTrail Road Landfill, 2026Fill (asphalt, masonry, concrete without rebar) is $144 per tonne (minimum $36).
Haul-awayTrail Road Landfill, 2026Trail Road Landfill, 2026: construction material from the home owner is $172.70 per tonne above 250 kg (minimum $43.20).
Haul-awayTrail Road Landfill, 2026The landfill does not accept asbestos or commercial garbage.

What the quote should say

  1. Where the price stops: down to grade, with the foundation and backfill priced separately or left to another company.
  2. Who applies for the permit and who arranges each utility disconnection, gas first.
  3. Where the debris goes and whether disposal is included.
  4. The site fence the City's Building By-law requires, and who puts it up and takes it down.
  5. A WSIB clearance certificate and proof of liability insurance.

Quick answers

Is the $1,170 on the City's fee schedule the permit fee?

No. On the 2026 schedule, $1,170 is an administrative surcharge for starting a demolition before the permit is issued on a property under the Demolition Control By-law. The Permit to Demolish itself is $117 for the first 5,000 square feet of gross floor area.

Why does the gas come first?

The City's clearances form says Enbridge Gas Distribution requires 44 days from time of payment to disconnect natural gas service. That is the longest published wait in a house demolition.

Does Hydro Ottawa charge to remove the electrical service?

Hydro Ottawa's Conditions of Service say permanent removal of a 200 A or smaller service for a residential single family or duplex home is free at the homeowner's request. Other removals are charged on a cost recovery basis.

Want this done at your place?

Tell us what you are taking down and we'll send it to local Ottawa demolition contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.

Fields marked are required.

We won't call you. There's no phone box above because we don't ask for one — your estimate comes by email, on your time.

Request received We’ve sent your details to local Ottawa demolition contractors. Interested contractors reply by email. A confirmation is on its way to your inbox.
Find a Demolition Contractor