Interior Gut Cost in Ottawa: per Square Foot and per Room

  • Selective: about $4 to $15 per sq ft
  • Full gut to the studs: about $12 to $25 per sq ft
  • Single room: about $1,500 to $4,500

Interior work is priced three ways in the lists: per square foot for selective removal, per square foot for a full gut down to the framing, and per room. Each is its own line; none is worked out from another.

Service: Interior Strip-Out Reviewed October 2, 2026. How we set these ranges

Job sheet

Interior gut and single rooms

Three bills in three units. They are never added together.

City permitno fee shown

  • The City says removing non-load-bearing interior partitions does not need a demolition permit.
  • For stripping finishes such as drywall, cabinets and flooring, the City's pages say nothing either way. Ask Building Code Services before you start.
  • A load-bearing wall is a structural change, not a strip-out: ottawacarpenters.ca.
  • The renovation that follows may need its own building permit.

Teardownper sq ft · per room

Selective, per sq ft

About $4 to $15

  • An Ontario cost guide, last reviewed June 2026: $4 to $15 per sq ft, selective
  • A Toronto restoration company, updated July 2026: $4 to $8 per sq ft light selective; $7 to $15 standard

Full gut, per sq ft

About $12 to $25

  • An Ontario cost guide, last reviewed June 2026: $12 to $25 per sq ft, full gut
  • A Toronto restoration company, updated July 2026: $12 to $25 per sq ft, non-structural removal down to the framing

Single room

About $1,500 to $4,500

  • A Toronto demolition company, March 2025: $1,500 to $4,000 per room
  • A Toronto-area demolition company, updated September 2026: $1,800 to $4,500 for a single room

Three separate published figures. A room price is not a square-foot price times the room.

Published prices seen October 2026 (Ontario, GTA and Canadian sources; we found no Ottawa-specific published price). Not quotes.

Haul-awayper tonne

The City's rates at its own landfill: context, not a price for your job.

  • Trail Road Landfill, 2026: construction material from the home owner is $172.70 per tonne above 250 kg (minimum $43.20).

Ask where your contractor takes the debris and whether disposal is in the price. All 2026 Trail Road rates

Not on this sheet

  • Load-bearing wallsottawacarpenters.ca
  • Asbestos testing and removalottawaabatement.com
  • Bin rentalottawaconstructionbins.ca
Get quotes for this
Interior gut and single rooms: the three lanes of the job sheet. The lanes are never added together.
LaneItemFigure or rule
TeardownSelective, per sq ft (An Ontario cost guide, last reviewed June 2026)$4 to $15 per sq ft, selective
TeardownSelective, per sq ft (A Toronto restoration company, updated July 2026)$4 to $8 per sq ft light selective; $7 to $15 standard
TeardownFull gut, per sq ft (An Ontario cost guide, last reviewed June 2026)$12 to $25 per sq ft, full gut
TeardownFull gut, per sq ft (A Toronto restoration company, updated July 2026)$12 to $25 per sq ft, non-structural removal down to the framing
TeardownSingle room (A Toronto demolition company, March 2025)$1,500 to $4,000 per room
TeardownSingle room (A Toronto-area demolition company, updated September 2026)$1,800 to $4,500 for a single room
Haul-awayTrail Road Landfill, 2026Trail Road Landfill, 2026: construction material from the home owner is $172.70 per tonne above 250 kg (minimum $43.20).

What the quote should say

  1. Selective or full gut, and the square footage the price is based on.
  2. A list of what stays: framing, stairs, specific walls or finishes.
  3. Who shuts off and caps plumbing and wiring.
  4. How occupied parts of the house are protected.

Quick answers

What is the difference between selective demolition and a full gut?

In the price lists, selective work removes chosen elements and protects the rest; a full gut removes all non-structural interior finishes down to the framing.

Can the house be lived in during a gut?

Ontario's Building Code says demolition of a building or any part of it does not start before the occupants have left, except where their safety is not affected.

Does removing a wall make it carpentry?

A non-load-bearing wall can come out as part of the strip-out. A load-bearing wall is a structural change: ottawacarpenters.ca.

Want this done at your place?

Tell us what you are taking down and we'll send it to local Ottawa demolition contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.

Fields marked are required.

We won't call you. There's no phone box above because we don't ask for one — your estimate comes by email, on your time.

Request received We’ve sent your details to local Ottawa demolition contractors. Interested contractors reply by email. A confirmation is on its way to your inbox.
Find a Demolition Contractor