What should I check before hiring a demolition company in Ottawa?
What should I check before hiring a demolition company in Ottawa?
Four things to sort out before you sign anything with a demolition contractor in Ottawa.
What the contractor is responsible for
Ask for proof of liability insurance and a WSIB clearance certificate. Ontario has no demolition-contractor licence we could find, so those two documents are the practical stand-ins. WSIB says people who own or run a business in construction must have coverage, with some exceptions.
Ask who applies for the City's demolition permit. The Building By-law allows a contractor to apply as your authorized agent, but confirm it in writing so the responsibility is clear. Ask the same about the utility sign-offs: each utility connected to the property signs off before the permit is issued, and Enbridge Gas requires 44 days from time of payment to disconnect natural gas service, so whoever is coordinating that needs to start early.
The City's demolition page says that section 30 of the Occupational Health and Safety Act requires a project owner to identify designated substances on the project and provide a list to prospective contractors before entering into a binding contract. O. Reg. 490/09 lists eleven designated substances, including asbestos, lead, mercury and silica. Health Canada advises hiring a professional to test for asbestos before demolition, and if asbestos is found, hiring a qualified asbestos removal specialist. Ask the contractor how they handle the designated substances list and whether an abatement contractor is involved before demolition begins.
Get an itemized written quote that spells out what comes down, where the work stops (this site covers demolition down to grade; anything below grade is excavation work), where the debris goes, and whether hauling is included in the price. Ask whether the permit fee, utility disconnection fees and the site fence are included or billed separately. The Consumer Protection Act, 2002 says that if your agreement includes an estimate, the contractor cannot charge more than 10 per cent above that estimate.
If you are negotiating or signing at your home rather than at the contractor's place of business, the agreement is a direct agreement under the Consumer Protection Act, 2002 and must be in writing. You have the right to cancel without reason from the day the agreement is made until 10 days after you receive the written copy.
Before you commit, ask each contractor to name, in writing, everything their price leaves out.
Want this done at your place?
Tell us what you are taking down and we'll send it to local Ottawa demolition contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.
Demolition IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local demolition contractors in Ottawa. Free matching, no obligation.