Teardown and rebuild in Westboro: what has to happen first?
Teardown and rebuild in Westboro: what has to happen first?
Before any demolition work starts in Westboro, three things need to be sorted out: the designated substances check, the utility disconnections, and the demolition permit. Heritage and demolition control may also apply, depending on the specific property.
Before you contract with anyone
The City's demolition page says that section 30 of the Occupational Health and Safety Act requires a project owner to identify designated substances on the project and provide a list to prospective contractors before entering into a binding contract. O. Reg. 490/09 lists eleven designated substances, including asbestos, lead, mercury and silica. Health Canada advises hiring a professional to test for asbestos before demolition, and says asbestos was mainly used in buildings before 1990. If a professional finds asbestos, Health Canada says to hire a qualified asbestos removal specialist. That work is handled by an abatement contractor before the demolition crew arrives; more on that at ottawaabatement.com. Ask each contractor you speak with how they handle the designated substances list and whether an abatement contractor is involved.
The City's Demolition Permit Clearances Form requires sign-off from every utility connected to the property: City water, City sewer, Enbridge Gas, Hydro Ottawa or Hydro One (ask which one serves the property), Bell, Rogers, and the home heating fuel confirmation if there is an oil tank. Enbridge Gas requires 44 days from time of payment to disconnect natural gas service, which is the longest published wait, so contact them early. Each utility may charge its own fee. The clearances form goes in with the permit application; the City's first review takes about 10 business days.
Two additional layers may apply in Westboro. Demolition Control By-law 2012-377 covers residential properties within a mapped area of the city; ask the City whether this address is inside that boundary. If it is, and no building permit for the replacement house has been issued yet, the General Manager's approval is needed with conditions, including landscaping the lot and registering an agreement. Separately, ask the City whether the property is designated under the Ontario Heritage Act or sits inside a Heritage Conservation District, both of which require council or municipal approval before demolition.
Before signing anything, confirm in writing:
- what structures come down and exactly where the work stops at grade (foundations, footings and backfill are excavation work, covered at excavateottawa.ca)
- who applies for the demolition permit and who arranges each utility sign-off
- where the debris goes and whether hauling is included in the price
- the designated substances list and how it will be handled
Related service: Whole House Demolition What it costs: Whole house
Want this done at your place?
Tell us what you are taking down and we'll send it to local Ottawa demolition contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.
Demolition IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local demolition contractors in Ottawa. Free matching, no obligation.