Fire-damaged house in Orleans: how does demolition get started?
Fire-damaged house in Orleans: how does demolition get started?
A fire-damaged house still needs a City of Ottawa demolition permit before work begins, and the fire changes the order of a few steps without removing any of them. The place to start is the designated substances list.
Health Canada advises hiring a professional to test for asbestos before demolition, and to hire a qualified asbestos removal specialist if asbestos is found. For lead, Health Canada says a home built before 1960 probably contains lead-based paint, and exterior surfaces of homes built between 1960 and 1990 may as well. Ask the contractor how they handle the designated substances list and whether an abatement contractor needs to be involved before demolition begins.
Utilities and the permit
Every utility still has to be signed off on the City's Demolition Permit Clearances Form, and a fire does not automatically mean they have been disconnected safely. Enbridge Gas requires 44 days from time of payment to disconnect natural gas service, so arranging that sign-off early matters. The clearances form covers water, sewer, Enbridge Gas, Hydro Ottawa or Hydro One (ask which one serves the property), Bell, Rogers, and, if applicable, septic decommissioning through the Rideau Valley Conservation Authority and confirmation that a heating oil tank has been emptied. O. Reg. 213/91 s.214(3) requires that all gas, electrical and other services that may endanger people be shut off and disconnected before demolition begins and remain so throughout.
The permit application goes through a My ServiceOttawa account and includes a site plan and the completed clearances form. The City lists a first review of about 10 business days. If the property is inside the Area of Demolition Control, the by-law exempts demolition carried out under a fire or unsafe-building order, so ask the City whether that applies. Ask the City's Building Code Services whether the fire damage affects any part of the application.
A few things to confirm in writing with any contractor before signing: what exactly comes down and where the work stops at grade (foundation removal and backfill are excavation work, covered at excavateottawa.ca), who applies for the permit, who coordinates each utility sign-off, where the debris goes, and what the payment schedule is.
One question for each contractor: does the price assume the fire-damaged material goes to the same place as the rest of the debris?
Related service: Whole House Demolition What it costs: Whole house
Want this done at your place?
Tell us what you are taking down and we'll send it to local Ottawa demolition contractors, who reply by email. We send it out to local contractors for you. Free, no pressure.
Demolition IQ -- Built from the Ontario Building Code, Ontario regulations and City of Ottawa sources and real construction experience. Answers are for informational purposes only and are not a professional assessment.
Ready to Get Quotes?
Find local demolition contractors in Ottawa. Free matching, no obligation.